Rail layer – what it takes

level 1 (entry) specialist machine suggestion, not checked

Show me on the map More in this field

Machine suggestion, not checked. A language model proposed the role's level and track from the occupation's ESCO name and description; the skill list is ESCO's essential skills. No person has checked it yet.

What does it take?

Rail layers construct railway tracks on prepared sites. They monitor equipment that sets railroad sleepers or ties, usually on a layer of crushed stone or ballast. Rail layers then lay the rail tracks on top of the sleepers and attach them to make sure the rails have a constant gauge, or distance to each other. These operations are usually done with a single moving machine, but may be performed manually.

Skills (14)

  • apply arc welding techniques
  • apply spot welding techniques
  • apply thermite welding techniques
  • follow health and safety procedures in construction
  • inspect construction supplies
  • keep heavy construction equipment in good condition
  • react to events in time-critical environments
  • recognise signs of corrosion
  • secure working area
  • transport construction supplies
  • use measurement instruments
  • use safety equipment in construction
  • work ergonomically
  • work in a construction team

Knowledge (4)

  • mechanical systems
  • mechanics
  • rail infrastructure
  • work trains

ESCO 9312.1.2